Projects Details

     
    JCI CDM Center
Validator / Verifier for GHG emission reduction
      Tel: 3-3222-8100/Fax: 3-3222-8101
E-Mail: cdm@jci-plant.or.jp
 
Project Title  JCI-CDM-VAL-07/013
73 MW Tonghua Iron & Steel Waste Gas and Heat Power Generation Project
(resubmission)
Country People's Republic of China
Outline

73 MW Tonghua Iron & Steel Waste Gas and Heat Power Generation Project will be implemented within the premise of Tonghua Iron & Steel Co., Ltd. in Erdaojiang Qu, Tonghua City, Jilin Province, China.
The project will be managed by Tonghua Iron & Steel Group Co., Ltd., which is the parent company of Tonghua Iron & Steel Co., Ltd. The project will install a unique “Steam Network Power Generation System” with the total capacity of 73MW. The project activity will generate 317,414MWh of electricity
annually, which is totally consumed at Tonghua Iron & Steel Co., Ltd. It will displace electricity supplied from the Northeast China Power Grid that is mainly supplied by fossil fuel fired power plants. It is estimated that the project will reduce greenhouse gas emissions equivalent to 332,781tCO2e annually.

The “Steam Network Power Generation System” installed by the project activity is composed of:

1. Combined Cycle Power Plant (CCPP), which utilises Blast Furnace Gas (BFG) and Coke Oven Gas (COG) – low heat value “waste gas” - as fuels, which are otherwise not used but left flared; and
2. Coke Dry Quenching (CDQ), which recovers sensible heat from the coke ovens and produces steam by replacing a wet quenching system.

TD>
Project Documents PDD
JCI Report  
Comments Open:  2008.2.6 Close:  2008.3.6
Note:  A sender of comments will be expected to mention the following information. Name, Company / Organization, Type of Organization (Stakeholder / NGO / other), City, Country and email address. The comments and information will be opened, but not be used for other purposes.
Comment 1  The net electricity generation for this 73MW project is 317,414 Mwh/yr. It gives a annual operation hour of less than 5,000 hours. Normally the operation hour for such project could reach 7,000 hours. What is the reason for the low operatoin hours? This should also be a sensitive factor in sensitive analysis.
 
Second, project mentioned a 0.018 RMB/m3 price for waste gas. This is self captive power plant using previously not used valueless waste gas. Why such cost is considered?
Received:   19 February, 2008
Subject:
Comment by:
Long Yan
Huanneng environmental protection center,
Beijing, China 
Comment 2  
Received:  
Subject:  
Comment by:  
Remark



 
Copyright(C)2007 Japan Consulting Institute All Rights Reserved.